Objective: to stop the historical ground sliding & settling under an Aina Haina property which had left one side of the residence hanging 3’ in the air. We were able to stabilize the house using micropiles, tiebacks & gunite days before a 40 day rain which resulted in 2000 yds of soils material sliding down the lot & resulting in 13 ft hi pile up on the road below. Temporary retaining walls were erected using hundreds of micropiles & gunite to stabilize the hillside from further landslides.

Results From 40 Days of RainMudslide!Clearing The RoadOverviewErosion Silt FenceUpper Tiebacks For Retaining WallAccessWork In ProgressTieback For Retaining WallGuniting Wall Form With SleevesGravel Backfilling of Wall